DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS IEC TR 62263:2005 ED1

Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines

Jul 6, 2023

General information

60.60     Jul 6, 2023

95.99   

DPS

DPS/KT 4

Technical Report

13.260     29.240.99     29.260.99     13.26  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This Technical Report covers procedures for the installation and maintenance of optical fibre cables on overhead power lines. This includes: - optical ground wire (OPGW) fibre cable; - optical phase conductor (OPPC) fibre cable; - optical attached fibre cable (OPAC); - all dielectric self supporting (ADSS) optical fibre cable. Optical fibre cables are considered for single and multi-circuit constructions in common use within some countries. The primary concern is the necessary precautions to ensure the safety of personnel and equipment when installing or maintaining these types of optical fibre cable on overhead power lines.

Life cycle

NOW

PUBLISHED
DS IEC TR 62263:2005 ED1
60.60 Standard published
Jul 6, 2023

Related project

Adopted from IEC TR 62263:2005 ED1