DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC TR 62263:2005 ED1

Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines

Dec 13, 2005

General information

99.60     Dec 10, 2024

IEC

TC 78

Technical Report

13.260     29.240.99     29.260.99  

English   French  

Buying

Revised

Language in which you want to receive the document.

Scope

This Technical Report covers procedures for the installation and maintenance of optical fibre cables on overhead power lines. This includes: - optical ground wire (OPGW) fibre cable; - optical phase conductor (OPPC) fibre cable; - optical attached fibre cable (OPAC); - all dielectric self supporting (ADSS) optical fibre cable. Optical fibre cables are considered for single and multi-circuit constructions in common use within some countries. The primary concern is the necessary precautions to ensure the safety of personnel and equipment when installing or maintaining these types of optical fibre cable on overhead power lines.

Life cycle

NOW

WITHDRAWN
IEC TR 62263:2005 ED1
99.60 Withdrawal effective
Dec 10, 2024

REVISED BY

PUBLISHED
IEC TR 62263:2024 ED2

National adoptions

Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines

60.60 Standard published

DPS/KT 4 more