DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Fibre optic interconnecting devices and passive components - Performance standard - Part 022-07: Hardened fibre optic connectors terminated on multimode fibre cable for category A – Outdoor aerial environment

10.20 New project ballot initiated

TC 86/SC 86B more

Fiber Optic Active Components and Devices – Test and Measurement Procedures – Part 8: Universal vertical mezzanine boards for photonic devices

10.60 Close of voting

TC 86/SC 86C more

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00 Proposal for new project received

TC 87 more

Wind Energy Generation Systems – Part 18: Design Guideline for Pitch Bearings

00.00 Proposal for new project received

TC 88 more

Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield

10.60 Close of voting

TC 88 more

Wind energy generation systems – Part 34: Fire prevention, protection and evacuation

10.20 New project ballot initiated

TC 88 more

Wind Energy Generation Systems - Part 33: Bird mortality prevention strategies. Bird Detection and Identification Systems

00.00 Proposal for new project received

TC 88 more

Grid Connection Requirements for Converter-Based Resources Interconnecting with Bulk Power Systems

10.20 New project ballot initiated

TC 8/SC 8A more

Grid-forming technology and applications in renewable energy dominated power systems

00.00 Proposal for new project received

TC 8/SC 8A more

Coordinated Automatic Voltage Control for Power System with High Penetration of IBR(Inverter-based resource)

00.00 Proposal for new project received

TC 8/SC 8C more

Business Use Cases (BUCs) of Flexibility Services

10.60 Close of voting

TC 8/SC 8C more

Guidelines for assessment of power system resilience

00.99 Approval to ballot proposal for new project

TC 8/SC 8C more

Technical Specification for Automatic Voltage Control of Power System with Integration of lBR (Inverter based Resource)

10.20 New project ballot initiated

TC 8/SC 8C more

Technical Specification for System Restoration of Interconnected Power Systems Using VSC-HVDC

10.20 New project ballot initiated

TC 8/SC 8C more

Railway Applications – Requirements for software development

10.60 Close of voting

TC 9 more

Railway applications - Safety protocols for signaling applications - Part 1: Generic aspects of safety related transmission protocols

10.20 New project ballot initiated

TC 9 more

Railway applicatios - Safety protocols for signaling applications - Part 3: PVS: Safety related transmission protocol for application between ground systems

10.20 New project ballot initiated

TC 9 more

Railway applications - Safety protocols for signaling applications - Part 4: Rail Safe Transport Application Protocol

10.20 New project ballot initiated

TC 9 more