DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Explosive atmospheres - Part 28: Protection of equipment and transmission systems using optical radiation

50.00 Final text received or FDIS registered for formal approval

TC 31 more

Explosive atmospheres - Part 29-0: Gas detectors - General requirements and test methods, and possible supplementary parts.

50.00 Final text received or FDIS registered for formal approval

TC 31 more

Explosive atmospheres - Part 29-3: Gas detectors - Guidance on functional safety of fixed gas detection systems

30.99 CD approved for registration as DIS

TC 31 more

Explosive atmospheres - Part 30-1: Electrical resistance trace heating - General and testing requirements

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 31 more

Explosive atmospheres – Part 30-2: Electrical resistance trace heating – Guidance on application for design, installation and maintenance

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 31 more

Explosive atmospheres - Part 33: Equipment protection by special protection 's'

30.60 Close of voting/ comment period

TC 31 more

Explosive atmospheres - Part 42: Electrical safety devices for the control of potential ignition sources for Ex-Equipment

40.00 DIS registered

TC 31 more

Explosive atmospheres - Part 45 - Electrical Ignition Systems for Internal Combustion Engines

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 31 more

Explosive atmospheres - Part 46: Equipment assemblies

40.00 DIS registered

TC 31 more

Primary batteries - Part 1: General

40.60 Close of voting

TC 35 more

Primary batteries - Part 2-1: Physical and electrical specifications of batteries with aqueous electrolyte

40.99 Full report circulated: DIS approved for registration as FDIS

TC 35 more

Primary batteries - Part 2-2: Physical and electrical specifications of lithium batteries

40.99 Full report circulated: DIS approved for registration as FDIS

TC 35 more

Primary batteries - Part 5: Safety of batteries with aqueous electrolyte

20.99 WD approved for registration as CD

TC 35 more

Primary batteries - Part 6: Guidance on environmental aspects

20.99 WD approved for registration as CD

TC 35 more

Coin/lithium button cell saline soak test simulating cell ingestion

30.60 Close of voting/ comment period

TC 35 more

Electrical installations in ships - Part 301: Equipment - Generators and motors

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 18 more

Electrical installations in ships - Part 302-2: Low voltage switchgear and controlgear assemblies - Marine power

50.00 Final text received or FDIS registered for formal approval

TC 18 more

Electrical installations in ships - Part 305: Equipment - Storage batteries

40.00 DIS registered

TC 18 more