Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Explosive atmospheres - Part 28: Protection of equipment and transmission systems using optical radiation
50.00 Final text received or FDIS registered for formal approval
Explosive atmospheres - Part 29-0: Gas detectors - General requirements and test methods, and possible supplementary parts.
50.00 Final text received or FDIS registered for formal approval
Explosive atmospheres - Part 29-3: Gas detectors - Guidance on functional safety of fixed gas detection systems
30.99 CD approved for registration as DIS
Explosive atmospheres - Part 30-1: Electrical resistance trace heating - General and testing requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Explosive atmospheres – Part 30-2: Electrical resistance trace heating – Guidance on application for design, installation and maintenance
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Explosive atmospheres - Part 33: Equipment protection by special protection 's'
30.60 Close of voting/ comment period
Explosive atmospheres - Part 42: Electrical safety devices for the control of potential ignition sources for Ex-Equipment
40.00 DIS registered
Explosive atmospheres - Part 45 - Electrical Ignition Systems for Internal Combustion Engines
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Primary batteries - Part 2-1: Physical and electrical specifications of batteries with aqueous electrolyte
40.99 Full report circulated: DIS approved for registration as FDIS
Primary batteries - Part 2-2: Physical and electrical specifications of lithium batteries
40.99 Full report circulated: DIS approved for registration as FDIS
Primary batteries - Part 5: Safety of batteries with aqueous electrolyte
20.99 WD approved for registration as CD
Primary batteries - Part 6: Guidance on environmental aspects
20.99 WD approved for registration as CD
Coin/lithium button cell saline soak test simulating cell ingestion
30.60 Close of voting/ comment period
Electrical installations in ships - Part 301: Equipment - Generators and motors
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electrical installations in ships - Part 302-2: Low voltage switchgear and controlgear assemblies - Marine power
50.00 Final text received or FDIS registered for formal approval
Electrical installations in ships - Part 305: Equipment - Storage batteries
40.00 DIS registered