Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Fire containment — Elements of building construction — Part 1: Ventilation ducts
30.20 CD study/ballot initiated
Glass — Resistance to attack by a boiling aqueous solution of mixed alkali — Method of test and classification
30.60 Close of voting/ comment period
Polyolefin pipes and fittings — Determination of carbon black content by calcination and pyrolysis — Test method
40.99 Full report circulated: DIS approved for registration as FDIS
Natural gas — Determination of composition and associated uncertainty by gas chromatography — Part 1: General guidelines and calculation of composition
00.00 Proposal for new project received
Natural gas — Determination of composition and associated uncertainty by gas chromatography — Part 2: Uncertainty calculations
00.00 Proposal for new project received
Natural gas — Determination of composition and associated uncertainty by gas chromatography — Part 3: Precision and bias
00.00 Proposal for new project received
Natural gas — Determination of composition and associated uncertainty by gas chromatography — Part 4: Guidelines and requirements for gas analysis
50.00 Final text received or FDIS registered for formal approval
Natural gas — Calculation of calorific values, density, relative density and Wobbe indices from composition
00.00 Proposal for new project received
Natural gas — Determination of mercury — Part 2: Sampling of mercury by amalgamation with detection by atomic fluorescence or atomic absorption spectrometry
20.20 Working draft (WD) study initiated
Side and face milling (slotting) cutters with indexable inserts — Dimensions
20.00 New project registered in TC/SC work programme
Carbonaceous materials for the production of aluminium — Pitch for electrodes — Determination of coking value
40.99 Full report circulated: DIS approved for registration as FDIS
Graphical symbols — Safety colours and safety signs — Registered safety signs
40.20 DIS ballot initiated: 12 weeks
Graphical symbols — Safety colours and safety signs — Registered safety signs — Amendment 166: Safety sign F020: Fire service connection point
40.20 DIS ballot initiated: 12 weeks
Graphical symbols — Safety colours and safety signs — Registered safety signs — Amendment 167: Safety sign F021: Valve of firefighting system
40.20 DIS ballot initiated: 12 weeks
Graphical symbols — Safety colours and safety signs — Registered safety signs — Amendment 168: Safety sign F022: Fire hydrant
40.20 DIS ballot initiated: 12 weeks
Graphical symbols — Safety colours and safety signs — Registered safety signs — Amendment 169: Safety sign M073: Have body temperature taken
40.20 DIS ballot initiated: 12 weeks
Graphical symbols — Safety colours and safety signs — Registered safety signs — Amendment 170: Safety sign M074: Keep distance
40.20 DIS ballot initiated: 12 weeks
Graphical symbols — Safety colours and safety signs — Registered safety signs — Amendment 171: Safety sign P083: No physical contact
40.20 DIS ballot initiated: 12 weeks