Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Dentistry — Endodontic instruments — Part 8: Accuracy of electronic apex locator
60.00 Standard under publication
Geometrical Product Specifications (GPS) — Length standards — Gauge blocks
00.00 Proposal for new project received
Determination of resistance to intergranular corrosion of stainless steels — Part 1: Austenitic and ferritic-austenitic (duplex) stainless steels — Corrosion test in nitric acid medium by measurement of loss in mass (Huey test)
20.99 WD approved for registration as CD
Determination of resistance to intergranular corrosion of stainless steels — Part 2: Ferritic,austenitic and ferritic-austenitic (duplex) stainless steels — Corrosion test in media containing sulfuric acid
20.99 WD approved for registration as CD
Determination of resistance to intergranular corrosion of stainless steels — Part 3: Corrosion test for low-Cr ferritic stainless steels
40.20 DIS ballot initiated: 12 weeks
Vacuum technology — Dimensions of knife-edge flanges
50.00 Final text received or FDIS registered for formal approval
Plastics — Aminoplastic moulding materials — Determination of volatile matter
20.00 New project registered in TC/SC work programme
Crude petroleum and liquid petroleum products — Laboratory determination of density — Hydrometer method
30.99 CD approved for registration as DIS
Industrial trucks — Safety requirements and verification — Part 1: Self-propelled industrial trucks, other than driverless trucks, variable-reach trucks and burden-carrier trucks
40.60 Close of voting
Industrial trucks — Safety requirements and verification — Part 4: Driverless industrial trucks and their systems
30.60 Close of voting/ comment period
Industrial trucks — Safety requirements and verification — Part 8: Regional requirements for countries outside the European Community
50.92 FDIS or proof referred back to TC or SC
Indicators of Effective Organizational Governance: Guidance
00.00 Proposal for new project received
Governance of organizations - General principles for ESG disclosure
00.00 Proposal for new project received
Competence requirements of Investigators for Organizations
20.00 New project registered in TC/SC work programme
Governance maturity model — Controlled groups of organizational entities — Guidance
40.20 DIS ballot initiated: 12 weeks
Sustainable cities and communities — Vocabulary
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks