Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Radiological protection — Radioactivity measurements — Methodology for the evaluation of the personal radon exposure
30.20 CD study/ballot initiated
Sustainable sports — State of the art for achieving and improving the sustainability of outdoor facilities
20.60 Close of comment period
Carbon footprint accounting and reporting of non-parallel steel wire and cords for tyre reinforcement
40.60 Close of voting
Purified water (PW) and water for injection (WFI) storage and distribution systems
40.00 DIS registered
General requirements and quality inspection methods for parcel locker
30.60 Close of voting/ comment period
Ships and marine technology — Design requirements for windlasses and winches for low temperature operation
30.20 CD study/ballot initiated
Ships and marine technology — Jacking system appliance on self-elevating unit — Safety protection
30.20 CD study/ballot initiated
Ships and marine technology — Roll on/Roll off ship-to-shore connection — Interface between terminals and ships with straight stern/bow ramps
10.60 Close of voting
Controls and protective devices for gaseous and liquid fuels — Material compatibility evaluation and qualification
20.60 Close of comment period
Ships and marine technology — Ship's mooring and towing fittings — Double cruciform bollards
20.99 WD approved for registration as CD
Guidelines for treatment and reuse of petroleum refinery wastewater
40.00 DIS registered
Assistive products — Guidelines on cognitive accessibility — Systems for taking medication
30.20 CD study/ballot initiated
Natural gas — Upstream area — Determination of porosity of shale by helium pycnometry
40.20 DIS ballot initiated: 12 weeks
Traditional Chinese medicine — Chuzhen instruments
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Small Craft — Electromagnetic Compatibility (EMC) — Test Methods and Requirements for Propulsion Systems and Electronic Sub-Assemblies
30.60 Close of voting/ comment period