Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Intelligent transport systems – Station unit requirements — Part 3: Roadside ITS stations
00.00 Proposal for new project received
Intelligent transport systems – Station unit requirements — Part 4: Personal ITS stations
00.00 Proposal for new project received
Metallic materials — Mechanical testing — Vocabulary
30.99 CD approved for registration as DIS
Industrial automation systems and integration — Ontology based interoperability — Part 1: Overview and fundamental principles
30.00 Committee draft (CD) registered
Automation systems and integration — Ontology based interoperability — Part 100: Schedule data ontology
30.60 Close of voting/ comment period
Automation systems and integration — Ontology based interoperability — Part 2: Vocabulary
30.60 Close of voting/ comment period
Automation systems and integration — Ontology based interoperability — Part 3: Industrial data ontology
40.60 Close of voting
Surface chemical analysis — Atomic force microscopy — Guideline for restoration procedure for atomic force microscopy images dilated by finite probe size
00.00 Proposal for new project received
Fine ceramics (advanced ceramics, advanced technical ceramics) — Methods for chemical analysis of zirconium oxide powders
40.99 Full report circulated: DIS approved for registration as FDIS
Testing of gas phase air cleaners for improving perceived indoor air quality
20.00 New project registered in TC/SC work programme
Cosmetics — Answers to frequently asked questions on ingredients and product characterization according to ISO 16128-1 and ISO 16128-2
20.00 New project registered in TC/SC work programme
Protective clothing — Enhanced visibility warning clothing for medium risk situations — Test methods and requirements
30.99 CD approved for registration as DIS
Methodology for achieving non-residential zero-energy buildings (ZEBs)
50.00 Final text received or FDIS registered for formal approval
Ships and marine technology — Marine environment protection — Specification for collecting data on ship's fuel oil consumption
40.60 Close of voting
Rolling bearings — Parts library — Reference dictionary for rolling bearings and spherical plain bearings
40.20 DIS ballot initiated: 12 weeks
Light and lighting — Building information modelling properties for lighting — Daylight louver systems
20.60 Close of comment period
Intelligent transport systems – Motorway chauffeur systems (MCS) — Part 3: Requirements and test procedures for mandatory lane change
00.00 Proposal for new project received