Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Bevel and hypoid gear geometry — Part 2: Sample calculations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Biotechnology — General requirements and considerations for cell line identification and cross-contamination testing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Rubber — General procedures for preparing and conditioning test pieces for physical test methods — Amendment 1
40.00 DIS registered
Requirements for sleeping bags — Part 3: Extreme sleeping bags
00.00 Proposal for new project received
Controls and protective devices for gaseous and liquid fuels — General requirements
40.60 Close of voting
Controls and protective devices for gaseous fuels — Particular requirements — Part 13: Pressure and/or flow rate regulators for inlet pressures up to and including 500 kPa, electronic types
00.00 Proposal for new project received
Gas pressure safety and control devices for use in gas transmission, distribution and installations for inlet pressures up to and including 10 MPa — Part 1: General requirements
20.00 New project registered in TC/SC work programme
Gas pressure safety and control devices for use in gas transmission, distribution and installations for inlet pressures up to and including 10 MPa — Part 2: Gas pressure regulator
20.00 New project registered in TC/SC work programme
Nuclear facilities — Classification of challenging conditions for HEPA filters design and qualification
20.00 New project registered in TC/SC work programme
Image technology colour management — Evaluating colour transform accuracy in ICC profiles
40.60 Close of voting
Biotechnology — Bioprocessing — General requirements and considerations for equipment systems used in the manufacturing of cellular therapeutic products
40.00 DIS registered
Natural gas — Measurement of properties — Inferential devices — Performance evaluation
20.00 New project registered in TC/SC work programme
Sulfur corrosion test method of copper winding in electric field for power equipment
50.00 Final text received or FDIS registered for formal approval
Safety and environment information for biogas plants, biogas transportation and biogas use
50.92 FDIS or proof referred back to TC or SC
Technical product specification (TPS) — Application guidance — International model for national implementation
00.00 Proposal for new project received
Petroleum products and lubricants — Life time testing of rolling bearing greases — Part 1: Part 1: Generalities — Principle of the evaluation of upper temperature limit of use
10.60 Close of voting
Soil quality — Sampling of soil invertebrates — Part 1: Hand-sorting and extraction of earthworms
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Soil quality — Sampling of soil invertebrates — Part 6: Design of sampling programmes with soil invertebrates
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks