DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Automatic electrical controls - Part 2-14: Particular requirements for electric actuators

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Automatic electrical controls - Part 2-23: Particular requirements for electrical sensors and sensing elements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Automatic electrical controls - Part 2-6: Particular requirements for automatic electrical pressure sensing controls including mechanical requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Automatic electrical controls - Part 2-8: Particular requirements for electrically operated water valves, including mechanical requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Automatic electrical controls - Part 2-5: Particular requirements for automatic electrical burner control systems

60.00 Standard under publication

DPS/KT 6 more

Corrigendum 1 - Semiconductor devices - Part 16-5: Microwave integrated circuits - Oscillators

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Semiconductor devices - Part 2: Discrete devices - Rectifier diodes

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Semiconductor devices - Part 5-12: Optoelectronic devices - Light emitting diodes - Test method of LED efficiencies

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Semiconductor devices - Part 5-8: Optoelectronic devices - Light emitting diodes - Test method of optoelectronic efficiencies of light emitting diodes

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Semiconductor devices - Part 6: Discrete devices - Thyristors

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Amendment 1 - Semiconductor devices - Discrete devices - Part 7: Bipolar transistors

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Semiconductor devices - Mechanical and climatic test methods - Part 30: Preconditioning of non-hermetic surface mount devices prior to reliability testing

60.55 Ratification completed (DOR)

DPS/KT 7 more

Semiconductor devices - Mechanical and climatic test methods - Part 34-1: Power cycling test for power semiconductor module

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Optical fibres - Part 1-40: Attenuation measurement methods

10.00 Proposal for new project registered

DPS/KT 3 more

Optical fibres - Part 2-50: Product specifications - Sectional specification for class B single-mode fibres

10.00 Proposal for new project registered

DPS/KT 3 more

Optical fibres - Part 2-60: Product specifications - Sectional specification for class C single-mode interconnection fibres

10.00 Proposal for new project registered

DPS/KT 3 more

Optical fibre cables - Part 1-107: Generic specification - Basic optical cable test procedures - Mechanical test methods - Torsion, method E7

10.00 Proposal for new project registered

DPS/KT 3 more

Optical fibre cables - Part 1-110: Generic specification - Basic optical cable test procedures - Mechanical tests methods - Kink, Method E10

10.00 Proposal for new project registered

DPS/KT 3 more