DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Aerospace series - Collar, swage locking, shear type, in aluminium alloy 6061, conversion coating - Inch series

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - Rod-end with bearing EN 4265 in corrosion resisting steel, internal threaded shank - Dimensions and loads, Inch series

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Aerospace series - Electrical cables, installation - Protection sleeves - Test methods - Part 302: High temperature exposure

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Medical electrical equipment - Part 1-3: General requirements for basic safety and essential performance - Collateral Standard: Radiation protection in diagnostic X-ray equipment

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Medical electrical equipment - Part 2-83: Particular requirements for the basic safety and essential performance of home light therapy equipment

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Electroacoustics - Audiometric equipment - Part 7: Instruments for the measurement of auditory evoked potentials

40.20 DIS ballot initiated: 12 weeks

DPS/KT 8 more

Insulation coordination for equipment within low-voltage supply systems - Part 1: Principles, requirements and tests

10.00 Proposal for new project registered

DPS/KT 3 more

Switches for household and similar fixed electrical installations - Part 2-2: Particular requirements - Electromagnetic remote-control switches (RCS)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Switches for household and similar fixed electrical installations - Part 2-3: Particular requirements - Time-delay switches (TDS)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Switches for household and similar fixed electrical installations - Part 2-4: Particular requirements - Isolating switches

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Flexible insulating sleeving - Part 2: Methods of test

10.00 Proposal for new project registered

DPS/KT 3 more

Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 281: Heat-shrinkable, polyolefin sleeving, semiconductive

10.00 Proposal for new project registered

DPS/KT 3 more

Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 282: Heat-shrinkable, polyolefin sleeving - Stress control

10.00 Proposal for new project registered

DPS/KT 3 more

Fire hazard testing - Part 5-1: Corrosion damage effects of fire effluent - General guidance

60.55 Ratification completed (DOR)

DPS/KT 8 more

Classification of environmental conditions - Part 3-6: Classification of groups of environmental parameters and their severities - Ship environments

40.20 DIS ballot initiated: 12 weeks

DPS/KT 8 more

Automatic electrical controls - Part 1: General requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Automatic electrical controls - Part 2-11: Particular requirements for energy regulators

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Automatic electrical controls - Part 2-13: Particular requirements for humidity sensing controls

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more