Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Space product assurance - Derating - EEE components
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Design rules for printed circuit boards
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Non-destructive testing
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adhesive bonding for spacecraft and launcher applications
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Durability testing of coatings and surface finishes
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Welding of metallic materials for flight hardware
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Qualification and Procurement of printed circuit boards
40.20 DIS ballot initiated: 12 weeks
Space product assurance - High-reliability soldering for surface mount, mixed technology and hand-mounted electrical connections
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Materials, processes and their data selection
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Processing and quality assurance requirements for metallic powder bed fusion technologies for space applications
40.20 DIS ballot initiated: 12 weeks
Space product assurance - Software product assurance
40.20 DIS ballot initiated: 12 weeks
Space engineering - Space environment
40.20 DIS ballot initiated: 12 weeks
Space engineering - Interface management
40.20 DIS ballot initiated: 12 weeks
Space engineering - System engineering general requirements
40.20 DIS ballot initiated: 12 weeks
Space engineering - Multipactor, design and test
40.20 DIS ballot initiated: 12 weeks
Space engineering - Electromagnetic compatibility
40.20 DIS ballot initiated: 12 weeks
Space engineering - Two-phase heat transport equipment
40.20 DIS ballot initiated: 12 weeks