Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Railway applications - Ballastless track systems - Part 3: Acceptance
40.20 DIS ballot initiated: 12 weeks
Leisure accommodation vehicles - Motor caravans - Part 1: Habitation requirements relating to health and safety
40.20 DIS ballot initiated: 12 weeks
Plastics and rubber machines - Tyre curing machines - Safety requirements
40.20 DIS ballot initiated: 12 weeks
Building automation and control systems (BACS) - Part 4: Control applications (ISO 16484-4:2025)
40.20 DIS ballot initiated: 12 weeks
Building automation and control systems (BACS) - Part 6: Data communication conformance testing (ISO 16484-6:2024)
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 2: Pipes
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 3: Fittings (ISO 16486-3:2025)
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 3: Fittings
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 4: Valves (ISO 16486-4:2025)
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 4: Valves
40.20 DIS ballot initiated: 12 weeks
Railway applications - Requirements for ERTMS Trackside Boards
40.20 DIS ballot initiated: 12 weeks
Residential solid fuel burning appliances - Part 2-10: Multi-firing sauna stoves fired by natural wood logs
40.20 DIS ballot initiated: 12 weeks
Residential solid fuel burning appliances - Part 2-5: Slow heat release appliances
40.20 DIS ballot initiated: 12 weeks
Residential solid fuel burning appliances - Part 2-7: Combination appliances fired by wood logs and pellets
40.20 DIS ballot initiated: 12 weeks
Modular mechanical locked floor coverings (MMF) - Specification, requirements and test method for multilayer modular panels for floating installation
40.20 DIS ballot initiated: 12 weeks
Railway applications - Design for PRM use - General requirements - Part 1: Contrast
40.20 DIS ballot initiated: 12 weeks
Railway applications - Design for PRM use - General requirements - Part 2: Information
40.20 DIS ballot initiated: 12 weeks
Railway applications - Design for PRM use - General requirements - Part 3: Optical and friction characteristics
40.20 DIS ballot initiated: 12 weeks