Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Space engineering - Cleanliness requirements for spacecraft propulsion hardware
40.20 DIS ballot initiated: 12 weeks
Space engineering - Simulation modelling platform
40.20 DIS ballot initiated: 12 weeks
Space engineering - SpaceFibre - Very high-speed serial link
40.20 DIS ballot initiated: 12 weeks
Space engineering - CANbus extention protocol
40.20 DIS ballot initiated: 12 weeks
Space engineering - Time triggered Ethernet
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adoption Notice of CCSDS 131.0-B-3, TM Synchronization and Channel Coding
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adoption Notice of CCSDS 132.0-B-2, TM Space Data Link Protocol
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adoption Notice of CCSDS 732.0-B-3, AOS Space Data Link Protocol
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adoption Notice of CCSDS 231.0-B-3, TC Synchronization and Channel Coding
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adoption Notice of CCSDS 232.0-B-3, TC Space Data Link Protocol
40.20 DIS ballot initiated: 12 weeks
Space engineering - Adoption Notice of CCSDS 232.1-B-2, Communications Operation Procedure-1
40.20 DIS ballot initiated: 12 weeks
Space engineering - Radio frequency and modulation
40.20 DIS ballot initiated: 12 weeks
Space engineering - Gyros terminology and performance specification
40.20 DIS ballot initiated: 12 weeks
Space engineering - Telemetry and telecommand packet utilization
40.20 DIS ballot initiated: 12 weeks
Space - Galileo Timing Receiver - Functional and Performance Requirements and associated Tests
40.20 DIS ballot initiated: 12 weeks
Geometrical product specifications (GPS) - Filtration - Part 21: Linear profile filters: Gaussian filters (ISO 16610-21:2025)
40.20 DIS ballot initiated: 12 weeks