DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Space engineering - Fracture control

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Cleanliness requirements for spacecraft propulsion hardware

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Simulation modelling platform

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - SpaceFibre - Very high-speed serial link

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - CANbus extention protocol

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Time triggered Ethernet

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Adoption Notice of CCSDS 131.0-B-3, TM Synchronization and Channel Coding

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Adoption Notice of CCSDS 132.0-B-2, TM Space Data Link Protocol

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Adoption Notice of CCSDS 732.0-B-3, AOS Space Data Link Protocol

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Adoption Notice of CCSDS 231.0-B-3, TC Synchronization and Channel Coding

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Adoption Notice of CCSDS 232.0-B-3, TC Space Data Link Protocol

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Adoption Notice of CCSDS 232.1-B-2, Communications Operation Procedure-1

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Communications

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Radio frequency and modulation

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Gyros terminology and performance specification

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space engineering - Telemetry and telecommand packet utilization

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Space - Galileo Timing Receiver - Functional and Performance Requirements and associated Tests

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Geometrical product specifications (GPS) - Filtration - Part 21: Linear profile filters: Gaussian filters (ISO 16610-21:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 12 more