DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC TS 62257-7:2017 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7: Generators

Sep 22, 2017

General information

60.60     Sep 22, 2017

IEC

TC 82

Technical Specification

27.16  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC TS 62257-7:2017 is also available as IEC TS 62257-7:2017 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.

IEC TS 62257-7:2017 specifies the general requirements for the generators in decentralized rural electrification systems. This document is a general introduction followed by more specific documents dedicated to the generation technologies which are the most currently used in rural electrification projects. This new edition includes the following significant technical changes with respect to the previous edition: removed the word "small" from the description of the PV systems, and removed the power limit (100 kVA); increased the relevant voltage levels to 1 000 V (AC) and 1 500 V (DC).

Life cycle

PREVIOUSLY

Revises
IEC TS 62257-7:2008 ED1

NOW

PUBLISHED
IEC TS 62257-7:2017 ED2
60.60 Standard published
Sep 22, 2017

National adoptions

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7: Generators

60.60 Standard published

DPS/KT 6 more

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login