DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS IEC/TS 62257-7:2017 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7: Generators

Apr 20, 2021

General information

60.60     Apr 20, 2021

95.99    May 27, 2025

DPS

DPS/KT 6

Technical Specification

27.16  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC TS 62257-7:2017 is also available as IEC TS 62257-7:2017 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.

IEC TS 62257-7:2017 specifies the general requirements for the generators in decentralized rural electrification systems. This document is a general introduction followed by more specific documents dedicated to the generation technologies which are the most currently used in rural electrification projects. This new edition includes the following significant technical changes with respect to the previous edition: removed the word "small" from the description of the PV systems, and removed the power limit (100 kVA); increased the relevant voltage levels to 1 000 V (AC) and 1 500 V (DC).

Life cycle

NOW

PUBLISHED
DS IEC/TS 62257-7:2017 ED2
60.60 Standard published
Apr 20, 2021

Related project

Adopted from IEC TS 62257-7:2017 ED2

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login