IEC 61326-2-4:2012 ED2

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9

Jul 10, 2012

General information

99.60     Oct 27, 2020

WPUB   

IEC

TC 65/SC 65A

International Standard

17.220.20     25.040.40     33.100.20  

English   French  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 61236-2-4:2012 specifies detailed test configurations, operational conditions and performance criteria for equipment for insulation monitoring according to IEC 61557-8 and insulation fault location according to IEC 61557-9. This applies to insulation monitoring devices and insulation fault location systems permanently or semi-permanently connected to the distribution system. This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. It includes the following significant technical change: update of the document with respect to IEC 61326-1:2012.

This publication is to be read in conjunction with IEC 61326-1:2012.

Life cycle

NOW

WITHDRAWN
IEC 61326-2-4:2012 ED2
99.60 Withdrawal effective
Oct 27, 2020

REVISED BY

PUBLISHED
IEC 61326-2-4:2020 ED3