DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 61326-2-4:2006 ED1

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9

Jun 13, 2006

General information

99.60     Jul 10, 2012

IEC

TC 65/SC 65A

International Standard

25.040.40     33.100.20  

English   French   Spanish  

Buying

Revised

Language in which you want to receive the document.

Scope

specifies more detailed test configurations, operational conditions and performance criteria than IEC 61326-1 for equipment for
- insulation monitoring according to IEC 61557-8
-insulation fault location according to IEC 61557-9;
This applies to insulation monitoring devices and insulation fault location systems permanently or semi-permanently connected to the distribution system.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61326:2002 ED1

WITHDRAWN
IEC 61326:2002/COR1:2002 ED1

NOW

WITHDRAWN
IEC 61326-2-4:2006 ED1
99.60 Withdrawal effective
Jul 10, 2012

CORRIGENDA / AMENDMENTS

WITHDRAWN
IEC 61326-2-4:2006/COR1:2011 ED1

REVISED BY

WITHDRAWN
IEC 61326-2-4:2012 ED2