DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 60512-10-4:2003

Connectors for electronic equipment - Tests and measurements - Part 10-4: Impact tests (free components), static load tests (fixed components), endurance tests and overload tests - Test 10d: Electrical overload (connectors)

Dec 18, 2006

General information

60.60     Jan 1, 2006

DPS

DPS/KT 4

European Norm

31.220.10  

English  

Buying

Published

Language in which you want to receive the document.

Scope

Draws up a standard method to assess the performance of mated contact pairs of connectors with an electrical overload current flowing through them for a limited period of time between 100 ms and 20 s. Is applicable to the electrical overload test of mated contact pairs of connectors.

Life cycle

NOW

PUBLISHED
SSH EN 60512-10-4:2003
60.60 Standard published
Jan 1, 2006

Related project

Adopted from EN 60512-10-4:2003

Adopted from IEC 60512-10-4 Ed. 2.0 b