DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 16907-7:2021

Earthworks - Part 7: Hydraulic placement of extractive waste

Nov 4, 2026

General information

60.60     Nov 4, 2026

95.99   

DPS

DPS/KT 288

European Norm

93.020  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This European Standard gives general guidelines for the hydraulic placement of extractive wastes applicable, in particular, to the extractive industries.
The scope of this European Standard includes any dam, confining embankment or other structure serving to contain, retain, confine or otherwise support such wastes on surface in a terrestrial environment.
This standard therefore addresses the characterisation of the extractive waste for the purposes of hydraulic placement in the MWF both as part of the confining embankment and for safe storage, and in addition:
- specifies minimum requirements for the data to be acquired before the design and execution stage of a hydraulic fill project;
- provides guidelines for the selection of the type of confining embankment appropriate for the selected site;
- provides guidelines for the selection and characterisation of the construction materials;
- establishes general principles on how to design and execute the hydraulic fill project from pre deposition through operation to closure and rehabilitation;
- provides guidelines for monitoring and quality control of all stages of the hydraulic fill project to ensure long-term safety and stability.

Life cycle

NOW

PUBLISHED
SSH EN 16907-7:2021
60.60 Standard published
Nov 4, 2026

Related project

Adopted from EN 16907-7:2021 IDENTICAL