DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

prSSH EN 16704-1:2016+A1:2021

Railway applications - Track - Safety protection on the track during work - Part 1: Railway risks and common principles for protection of fixed and mobile work sites

General information

40.20     Feb 9, 2026

40.60    May 11, 2026

DPS

DPS/KT 256

European Norm

93.100  

Scope

This European Standard provides requirements and measures to deal with the significant and specific railway risks during works on or in proximity of the track and with common principles for the protection of fixed and mobile work sites with trains and/or machines circulating on the working track and trains circulating on the adjacent track(s). Railway risks and protection measures for access and egress to/from the work site are considered in the same way as railway risks and protection measures for work itself.
This European Standard is applicable to all operations related to work activities on rail guided systems. Infrastructure of metro, tram and other light rail systems is excluded from the scope ).
The following specific railway risks are taken into consideration:
— Risk 1: Personnel being struck by a train or injured due to wind drag from a train on open working track (safety of the worker);
NOTE 1 Risk 1 includes injuring of a worker by machines, material or equipment being struck by a train on the working track.
— Risk 2: Personnel being struck by a train or injured due to wind drag from train on adjacent track (safety of the worker);
— Risk 3: Personnel being struck by machine or train on blocked track (safety of the worker);
— Risk 4: Machines, material or equipment being struck by a train on the adjacent track (safety of the operation/safety of the worker);
— Risk 5: Personnel being electrified or electrocuted by fixed electrical equipment (safety of the worker).
NOTE 2 Risk 5 includes hazards caused by pantographs of passing trains.
This European Standard also provides requirements to the process of installing basic preventive measures when planning new infrastructure or installing corrective measures when adapting existing infrastructure.
This European Standard may be extended to third parties when it is considered appropriate and reasonable by the infrastructure manager, if one or more of the five significant risks described inside this standard, arise as a result of their activities in proximity of the track.

Related directives

Directives related to this standards.

2016/797/EU

Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (Text with EEA relevance)

Life cycle

NOW

IN_DEVELOPMENT
prSSH EN 16704-1:2016+A1:2021
40.20 DIS ballot initiated: 12 weeks
Feb 9, 2026

Related project

Adopted from EN 16704-1:2016+A1:2021 IDENTICAL

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login