DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

prDS IEC TR 63037:2019 ED2

Electrical interface specifications for self ballasted lamps and controlgear in phase-cut dimmed lighting systems

General information

40.20     Feb 9, 2026

40.60    May 11, 2026

DPS

DPS/KT 4

Technical Report

29.140.99  

Scope

IEC TR 63037:2019 provides guidance to controlgear/integrated lamp designers for the development of products suitable to operate with future phase-cut dimmers. It describes the possible voltage signals and the expected response of the controlgear/integrated lamps. This document describes the expected response of controlgear during all operation states of a phase-cut lighting system and provides a complete understanding of the requirements for phase-cut dimmers. The response of a phase-cut dimmer is described in IEC 60669-2‑1:—, Annex EE. This document specifies the system performance aspects and test procedures for the control by mains voltage phase-cut dimming of the brightness of mains operated electronic lighting equipment intended to be controlled by mains voltage phase-cut dimmers, such as LED integrated lamps and light sources with external controlgear. Safety requirements are not covered by this document, but by respective product standards. This second edition cancels and replaces the first edition published in 2016. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
- emission of audible noise;
- ghosting caused by issues that are not related to the power supply of the dimmer or synchronization;
- stability of phase angle waveform (for the dimmer), including symmetry and stability tests;
- flicker of light loads;
- repetitive ring up voltage;
- dimming range; and
- number of switching cycles have been added.

Life cycle

PREVIOUSLY

PUBLISHED
SSH IEC/TR 63037:2016

NOW

IN_DEVELOPMENT
prDS IEC TR 63037:2019 ED2
40.20 DIS ballot initiated: 12 weeks
Feb 9, 2026

Related project

Adopted from IEC TR 63037:2019 ED2 IDENTICAL

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login