DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN ISO 34101-1:2020

Sustainable and traceable cocoa - Part 1: Requirements for cocoa sustainability management systems (ISO 34101-1:2019)

Dec 28, 2021

General information

60.60     Dec 28, 2021

DPS

European Norm

67.140.30  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This document specifies high-level requirements for management systems for sustainable cocoa bean production, including post-harvest processes, if applicable, and traceability of the sustainably produced cocoa beans within the organization producing the cocoa beans.
NOTE 1 Post-harvest processes include pod-breaking, fermentation, drying, sorting, packing, transport and storage of cocoa beans.
Only organizations that fulfil both the cocoa sustainability management system requirements of either this document or ISO 34101‑4:2019, Annex A or B, and the performance requirements of ISO 34101‑2 can claim their cocoa beans have been sustainably produced.
NOTE 2 ISO 34101-4 specifies the requirements for cocoa sustainability management systems at entry and medium levels.

Life cycle

NOW

PUBLISHED
SSH EN ISO 34101-1:2020
60.60 Standard published
Dec 28, 2021

Related project

Adopted from EN ISO 34101-1:2020