DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 50342-1:2015/A2:2021

Lead-acid starter batteries - Part 1: General requirements and methods of test

Aug 23, 2022

General information

60.60     Aug 23, 2022

95.99   

DPS

DPS/KT 4

European Norm

29.220.20  

English  

Buying

Published

Language in which you want to receive the document.

Scope

TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018
- Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document.
- Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.

Life cycle

NOW

PUBLISHED
SSH EN 50342-1:2015/A2:2021
60.60 Standard published
Aug 23, 2022

Related project

Adopted from EN 50342-1:2015/A2:2021

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login