DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS IEC TR 63191:2018 ED1

Demand side power quality management

Nov 24, 2021

General information

60.60     Nov 24, 2021

95.60   

DPS

DPS/KT 8

Technical Report

33.2     33.200  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC TR 63191:2018(E) specifies recommendations about power quality measurement and assessment within installations.
IEC TR 63191:2018 outlines the various phases needed for the establishment of a demand side power quality measurement plan for buildings and industry installations.
Such a power quality measurement plan will enable the optimization of the energy availability and efficiency, improve the assets lifetime and facilitate the resolutions of power quality problems. A power quality measurement plan encompasses the following stages:
• definition of the context, objectives and constraints;
• assessment of the initial power quality situation;
• definition of an action plan for the improvement of the power quality situation;
• implementation of the power quality measuring system;
• exploitation of the measurement system for the improvement of the power quality situation;
• maintenance of the measurement system.
IEC TR 63191:2018 will also help facility managers to tailor their measurement plan to the specific needs of the electrical system under their control. It addresses all the disturbances present in such networks, but does not cover the disturbances present in public electrical distribution networks (supply side) as they are governed by specific documents such as EN 50160 and IEC TS 62749.

Life cycle

NOW

PUBLISHED
DS IEC TR 63191:2018 ED1
60.60 Standard published
Nov 24, 2021

REVISED BY

PUBLISHED
DS IEC TS 63191:2023 ED2

Related project

Adopted from IEC TR 63191:2018 ED1 IDENTICAL