DS IEC/TR 61850-90-4:2020

Communication networks and systems for power utility automation - Part 90-4: Network engineering guidelines

Nov 18, 2020

General information

60.60     Sep 21, 2020

DPS

DPS/KT 9

Pure national standard

33.200  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC TR 61850-90-4:2020(E), which is a Technical Report, is intended for an audience familiar with network communication and/or IEC 61850-based systems and particularly for substation protection and control equipment vendors, network equipment vendors and system integrators.
This document focuses on engineering a local area network limited to the requirements of IEC 61850-based substation automation. It outlines the advantages and disadvantages of different approaches to network topology, redundancy, clock synchronization, etc. so that the network designer can make educated decisions. In addition, this document outlines possible improvements to both substation automation and networking equipment.
This document addresses data transfer over the network in IEC 61850, such as transmitting tripping commands for protection via GOOSE messages, and in particular the multicast data transfer of large volumes of sampled values (SV) from merging units (MUs).
This document considers seamless redundancy to increase the network availability under failure conditions and the high precision clock synchronization that is central to the process bus and synchrophasor operation.
This document is not intended as a tutorial on networking or on IEC 61850. Rather, it references and summarizes standards and publications to assist the engineers. Many publications discuss the Ethernet technology but do not address the networks in terms of substation automation. Therefore, many technologies and options have been ignored, since they were not considered relevant for a future-proof substation automation network design.
This document does not address network-based security, which is the subject of IEC 62351 and IEC 62443.
This document does not address technologies for wide area networks; these are covered by IEC TR 61850-90-12. Guidelines for communication outside of the substation that uses exclusively the routable Internet Protocol have been published, especially in documents IEC TR 61850-90-1 (substation to substation), IEC TR 61850-90-2 (substation to control center) and IEC TR 61850-90-5 (synchrophasor transmission). However, data flows used in substation-to-substation communication, or substation-to-control centre communication such as R-GOOSE and R-SV are covered when they transit over Ethernet links within the substation.
This document does not dispense the responsible system integrator from an analysis of the actual application configuration, which is the base for a dependable system
This second edition cancels and replaces the first edition published in 2013. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
• New object model for bridges and clocks based on UML autogeneration.
• An example of SCL configuration with a topology
• Extensions to the time distribution and clock
• Extension of the testing

Life cycle

NOW

PUBLISHED
DS IEC/TR 61850-90-4:2020
60.60 Standard published