Published
The present document specifies the stage 3 of the control plane of the GPRS Tunnelling Protocol, Version 2 for
Evolved Packet System interfaces (GTPv2-C).
In this document, unless otherwise specified, the S2b, S5 and S8 interfaces refer always to the GTP-based S2b, S5 and
S8 interfaces respectively .
GTPv2-C shall be used across the following EPC signalling interfaces: S3, S4, S5, S8, S10, S11 and S16.
GTPv2-C shall be used across the Sm and Sn interfaces for MBMS in EPS.
GTPv2-C based protocols shall also be used across Sv (3GPP TS 29.280 [15]) and S101 (3GPP TS 29.276 [14])
interfaces.
The procedures supported between the ePDG and the PGW on the S2b interface are specified in 3GPP TS 23.402 [45].
PUBLISHED
DS TS 129 274 V10.15.0:2018
60.60
Standard published
Aug 16, 2018