DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS TS 132 299 V14.6.0:2018

Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Charging management; Diameter charging applications (3GPP TS 32.299 version 14.6.0 Release 14)

Nov 27, 2018

General information

60.60     Aug 15, 2018

DPS

DPS/KT 10

Technical Specification

33.020  

English  

Buying

Published

Language in which you want to receive the document.

Scope

The present document is part of a series of Technical Specifications (TSs) that specify charging functionality and
charging management in GSM/UMTS networks. The GSM/UMTS core network-charging architecture and principles
are specified in TS 32.240 [1], which provides an umbrella for other charging management documents that specify.
- The content of the CDRs' per domain and subsystem (offline charging);
- The content of real-time charging messages per domain / subsystem (online charging);
- The functionality of online and offline charging for those domains and subsystems;
- The interfaces that are used in the charging framework to transfer the charging information (i.e. CDRs or
charging events).
The complete document structure for these TSs is defined in TS 32.240 [1].
The present document specifies in detail the Diameter based offline and online charging applications for 3GPP
networks. It includes all charging parameters, scenarios and message flows..
All terms, definitions and, abbreviations used in the present document, that are common across 3GPP TSs, are defined
in TR 21.905 [100]. Those that are common across charging management in GSM/UMTS domains, services or
subsystems are provided in the umbrella document TS 32.240 [1] and are copied into clause 3 of the present document
for ease of reading. Finally, those items that are specific to the present document are defined exclusively in the present
document.
Furthermore, requirements that govern the charging work are specified in TS 22.115 [101].

Life cycle

NOW

PUBLISHED
DS TS 132 299 V14.6.0:2018
60.60 Standard published
Aug 15, 2018

Related project

Adopted from TS 132 299 V14.6.0:2018 IDENTICAL

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login