DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 16602-70-36:2014

Space product assurance - Material selection for controlling stress-corrosion cracking

Jun 18, 2018

General information

60.60     Feb 27, 2018

DPS

DPS/KT 9

European Norm

49.025.01     49.140  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This Standard covers the following processes of the general materials, mechanicals parts and processes (MMPP) flow of ECSS-Q-ST-70:
• The selection of metal alloys for which preference is given to approved data sources (Table 5 1 to Table 5 3)
• The criticality analysis to determine if a stress corrosion cracking (SCC) evaluation is necessary
This Standard sets forth the criteria to be used in the selection of materials for spacecraft and associated equipment and facilities so that failure resulting from stress-corrosion is prevented.
It is intended to provide general criteria to be used in stress-corrosion cracking control, which begins during design thanks to a methodological material selection.
This document does not intend to include all factors and criteria necessary for the total control of stress­corrosion cracking in all alloys.
The criteria established in this Standard are only applicable to designs for service involving exposure conditions similar to testing conditions
As regards weldments, this Standard is applicable to aluminium alloys, selected stainless steels in the 300 series and alloys listed in Table 5 1.
This Standard is not applicable to listed materials whose behaviour differs at elevated temperature and in specific chemical.
This standard may be tailored for the specific characteristic and constrains of a space project in conformance with ECSS-S-ST-00.

Life cycle

NOW

PUBLISHED
SSH EN 16602-70-36:2014
60.60 Standard published
Feb 27, 2018

Related project

Adopted from EN 16602-70-36:2014

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login