DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS CEN/TR 1295-4:2015

Structural design of buried pipelines under various conditions of loading - Part 4: Parameters for reliability of the design

Nov 7, 2016

General information

60.60     Nov 7, 2016

DPS

DPS/KT 230

Technical Report

23.040.01  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This Technical Report lists the parameters for the reliability of the structural design of buried water and wastewater pressure pipelines, drains and sewers.
The reliability of the design of buried pipelines is based on the selection of appropriate design parameters for a chosen design method. This document identifies the parameters appropriate to the chosen design method, which should all be clearly stated.
This Technical Report does not aim to specify the requirements for the structural design of water and wastewater pressure pipelines, drains and sewers. EN 1295 1 “Structural design of buried pipelines under various conditions of loading — Part 1: General requirements” defines these requirements.
This Technical Report does not apply for offshore laying, pipes supported on piles, no dig pipelines, or laid above ground. Supplementary considerations need to be taken into account for these specific installations.
Special situations (e.g. landslide, earthquake, fire) are outside the scope of this document.
Design parameters for calculation of longitudinal effects (including bending moments, shear forces and tensile forces resulting for example from non uniform bedding and thermal movements and, in the case of pressure pipelines, from Poisson's contraction and thrust at change of direction or cross-section) are not covered in this document.

Life cycle

NOW

PUBLISHED
DS CEN/TR 1295-4:2015
60.60 Standard published
Nov 7, 2016

Related project

Adopted from CEN/TR 1295-4:2015

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login