DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 62769-103-4:2015

Field Device Integration (FDI) - Part 103-4: Profiles - PROFINET

Mar 31, 2016
95.99 Withdrawal of Standard   Jul 1, 2025

General information

95.99     Jul 1, 2025

DPS

DPS/KT 9

European Norm

25.040.40     35.100  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

IEC 62769-103-4:2015 specifies an FDI profile of IEC 62769 for IEC 61784-2_CP 3/4, IEC 61784-2_CP3/5 and IEC 61784-2_CP3/6 (PROFINET)

Life cycle

NOW

WITHDRAWN
SSH EN 62769-103-4:2015
95.99 Withdrawal of Standard
Jul 1, 2025

REVISED BY

PUBLISHED
SSH EN IEC 62769-103-4:2020

Related project

Adopted from EN 62769-103-4:2015

Adopted from IEC 62769-103-4 Ed. 1.0 b