DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 61850-7-410:2013

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Apr 28, 2014

General information

60.60     Feb 5, 2014

DPS

DPS/KT 9

European Norm

33.200  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN 61850-7-410:2007

NOW

PUBLISHED
SSH EN 61850-7-410:2013
60.60 Standard published
Feb 5, 2014

Related project

Adopted from EN 61850-7-410:2013

Adopted from IEC 61850-7-410 Ed. 2.0 b