DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 61280-4-4:2006

Fibre optic communication subsystem test procedures - Part 4-4: Cable plants and links - Polarization mode dispersion measurement for installed links

Oct 8, 2008
95.99 Withdrawal of Standard   Oct 30, 2023

General information

95.99     Oct 30, 2023

DPS

DPS/KT 8

European Norm

33.180.01  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This part of IEC 61280 provides uniform methods of measuring polarization mode dispersion (PMD) of single-mode installed links. An installed link is the optical path between transmitter and receiver, or a portion of that optical path. These measurements may be used to assess the suitability of a given link for high bit rate applications or to provide insight on the relationships of various related transmission attributes.

Life cycle

NOW

WITHDRAWN
SSH EN 61280-4-4:2006
95.99 Withdrawal of Standard
Oct 30, 2023

REVISED BY

PUBLISHED
SSH EN 61280-4-4:2017

Related project

Adopted from EN 61280-4-4:2006

Adopted from IEC 61280-4-4 Ed. 1.0 b