Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Roof coverings - Continuous rooflights of plastics with or without upstands - Classification, requirements and test methods
60.60 Standard published
Rigid underlays for discontinuous roofing - Definitions and characteristics
60.60 Standard published
Wood-based panels - Small scale indicative test methods for certain mechanical properties
60.60 Standard published
Flexible sheets for waterproofing - Bitumen damp proof courses - Definitions and characteristics
60.60 Standard published
Paper and board — Cut-size office paper — Measurement of curl in a pack of sheets
60.60 Standard published
Textiles - Knitted fabrics - Determination of stitch length and yarn linear density in weft knitted fabrics
60.60 Standard published
Textiles - Knitted fabrics - Determination of number of stitches per unit length and unit area
60.60 Standard published
Medical devices - Application of risk management to medical devices (ISO 14971:2019)
60.60 Standard published
Medical devices - Application of risk management to medical devices (ISO 14971:2019)
60.60 Standard published
Fixed firefighting systems - Watermist systems - Design and installation
60.60 Standard published
Fixed firefighting systems - Water mist systems - Part 1: Design, installation, inspection and maintenance
60.60 Standard published
Fixed firefighting systems - Water mist systems - Part 10: Test protocol for atrium protection with sidewall nozzles for open nozzle systems
60.60 Standard published
Fixed firefighting systems - Water mist systems - Part 11: Test protocol for cable tunnels for open nozzle systems
60.60 Standard published
Fixed firefighting systems - Water mist systems - Part 14: Test protocol for combustion turbines in enclosures exceeding 260 m³ for open nozzle systems
60.60 Standard published
Fixed firefighting systems - Water mist systems - Part 15: Test protocol for combustion turbines in enclosures not exceeding 260 m³ for open nozzle systems
60.60 Standard published