DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Future IEC 61300-3-55: FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS – BASIC TEST AND MEASUREMENT PROCEDURES – Part 3-55: Examination and measurements – Polarisation extinction ratio and keying accuracy of polarisation maintaining, passive, optical components

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components - Performance standard - Part 088-06: Non-connectorized single-mode fibre optic O-band DWDM devices with channel spacing of 800 GHz for category OP+ – Extended outdoor protected environment

00.99 Approval to ballot proposal for new project

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components – Connector optical interfaces for enhanced Macro bend multimode fibre – Part 3-XX: Connector parameters of physically contacting 50 μm core diameter fibres – Non-angled polyphenylene sulphide rectangular ferrules with a single row of 16 fibres for reference connector applications

10.20 New project ballot initiated

TC 86/SC 86B more

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00 Proposal for new project received

TC 87 more

Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing

10.20 New project ballot initiated

TC 87 more

Wind energy generation systems - Part 15-2: Framework for assessment and reporting of the wind resource and energy yield

10.60 Close of voting

TC 88 more

Design requirements for Wind Turbine Generators

10.60 Close of voting

TC 88 more

Generic EMT Simulation Models of Converter-based Power Plants for Power System Dynamic Analysis

10.20 New project ballot initiated

TC 8/SC 8A more

Roadmap of grid integration of renewable energy generation

00.00 Proposal for new project received

TC 8/SC 8A more

General requirements for grid-forming control of renewable energy

00.00 Proposal for new project received

TC 8/SC 8A more

Guideline for the black start of offshore wind farms grid-connected via VSC-HVDC

00.00 Proposal for new project received

TC 8/SC 8A more

Guideline for the planning and design of direct current or hybrid microgrids

10.20 New project ballot initiated

TC 8/SC 8B more

Coordinated Automatic Voltage Control for Power System with High Penetration of IBR(Inverter-based resource)

00.00 Proposal for new project received

TC 8/SC 8C more

General Guideline for the Carbon Emission Monitoring and Assessment in Interconnected Electric Power Systems

10.60 Close of voting

TC 8/SC 8C more

Technical Guidelines for the Function and Project Design of Ac-to-Dc Line Conversions

10.60 Close of voting

TC 8/SC 8C more

Guidelines for inertia management of renewable penetrated power system-Part 1:Framework design

10.20 New project ballot initiated

TC 8/SC 8C more

General Guidance on Renewable Energy Acquisition in Interconnected Electric Power Systems

00.00 Proposal for new project received

TC 8/SC 8C more

Primary Frequency Coordinated Control Framework of System with High Penetration of Inverter Based Generation

00.00 Proposal for new project received

TC 8/SC 8C more