Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Cleanrooms and associated controlled environments — Part 7: Separative devices (clean air hoods, gloveboxes, isolators and mini-environments)
00.00 Proposal for new project received
Implants for surgery — Active implantable medical devices — Part 1: General requirements for safety, marking and for information to be provided by the manufacturer
00.00 Proposal for new project received
Implants for surgery — Active implantable medical devices — Part 3: Implantable neurostimulators
00.00 Proposal for new project received
Implants for surgery — Two-part addition-cure silicone elastomers
00.00 Proposal for new project received
Road vehicles — Vehicle to grid communication interface — Part 21: Common 2nd generation network layer and application layer requirements conformance test plan
00.00 Proposal for new project received
Implants for surgery — Requirements for production of forgings
00.00 Proposal for new project received
Ergonomic design for the safety of machinery — Part 1: Principles for determining the dimensions required for openings for whole-body access into machinery
00.00 Proposal for new project received
Ergonomic design for the safety of machinery — Part 2: Principles for determining the dimensions required for access openings
00.00 Proposal for new project received
Ergonomic design for the safety of machinery — Part 3: Anthropometric data
00.00 Proposal for new project received
Petroleum and natural gas industries — Offshore production installations — Requirements and guidelines for emergency response
00.00 Proposal for new project received
Petroleum and natural gas industries — Drilling and production equipment — Part 1: Electric submersible pump systems for artificial lift
00.00 Proposal for new project received
Building Construction — Service Life Planning — Part 4: Service Life Planning using Building Information Modelling
00.00 Proposal for new project received
Buildings and constructed assets — Service-life planning — Part 8: Reference service life and service-life estimation
00.00 Proposal for new project received
Ships and marine technology — Hydrostatic release units
00.00 Proposal for new project received
Powered industrial trucks — Safety signs and hazard pictorials — General principles
00.00 Proposal for new project received
Plastics piping systems for hot and cold water installations — Crosslinked polyethylene (PE-X) — Part 1: General
00.00 Proposal for new project received