Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Petroleum and related products — Precision of measurement methods and results — Part 1: Determination of precision data in relation to methods of test
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Petroleum and related products — Precision of measurement methods and results — Part 2: Interpretation and application of precision data in relation to methods of test
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Petroleum and related products — Precision of measurement methods and results — Part 6: Verification of a test apparatus performance in relation to methods of test
10.20 New project ballot initiated
Cranes — Wire ropes — Care and maintenance, inspection and discard
00.00 Proposal for new project received
Surface active agents — Determination of pH of aqueous solutions — Potentiometric method
30.99 CD approved for registration as DIS
Surface active agents and soaps — Determination of water content — Azeotropic distillation method
30.20 CD study/ballot initiated
Non-ionic surface active agents — Determination of sulphated ash — Gravimetric method
30.20 CD study/ballot initiated
Bases for design of structures — Determination of snow loads on roofs
40.20 DIS ballot initiated: 12 weeks
Plain bearings — Multilayer materials for thin-walled plain bearings
30.99 CD approved for registration as DIS
Cigarettes — Determination of total and nicotine-free dry particulate matter using a routine analytical smoking machine
40.99 Full report circulated: DIS approved for registration as FDIS
Intelligent transport systems — Guided transportation service planning data exchange
20.00 New project registered in TC/SC work programme
Collaborative business relationship management systems — Requirements and framework
40.60 Close of voting
Collaborative business relationship management systems — Guidelines on the implementation of ISO 44001
20.00 New project registered in TC/SC work programme
Collaborative business relationship management system — Guidance on leadership for collaborative working
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks