DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Petroleum and related products — Precision of measurement methods and results — Part 1: Determination of precision data in relation to methods of test

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 28 more

Petroleum and related products — Precision of measurement methods and results — Part 2: Interpretation and application of precision data in relation to methods of test

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 28 more

Petroleum and related products — Precision of measurement methods and results — Part 6: Verification of a test apparatus performance in relation to methods of test

10.20 New project ballot initiated

ISO/TC 28 more

Cranes — Wind load assessment

40.20 DIS ballot initiated: 12 weeks

ISO/TC 96/SC 10 more

Cranes — Vocabulary — Part 1: General

60.00 Standard under publication

ISO/TC 96/SC 2 more

Cranes — Wire ropes — Care and maintenance, inspection and discard

00.00 Proposal for new project received

ISO/TC 96/SC 3 more

Cranes — Test code and procedures

20.00 New project registered in TC/SC work programme

ISO/TC 96/SC 4 more

Surface active agents — Determination of pH of aqueous solutions — Potentiometric method

30.99 CD approved for registration as DIS

ISO/TC 91 more

Surface active agents and soaps — Determination of water content — Azeotropic distillation method

30.20 CD study/ballot initiated

ISO/TC 91 more

Non-ionic surface active agents — Determination of sulphated ash — Gravimetric method

30.20 CD study/ballot initiated

ISO/TC 91 more

Wind actions on structures

40.60 Close of voting

ISO/TC 98/SC 3 more

Bases for design of structures — Determination of snow loads on roofs

40.20 DIS ballot initiated: 12 weeks

ISO/TC 98/SC 3 more

Plain bearings — Multilayer materials for thin-walled plain bearings

30.99 CD approved for registration as DIS

ISO/TC 123/SC 2 more

Cigarettes — Determination of total and nicotine-free dry particulate matter using a routine analytical smoking machine

40.99 Full report circulated: DIS approved for registration as FDIS

ISO/TC 126 more

Intelligent transport systems — Guided transportation service planning data exchange

20.00 New project registered in TC/SC work programme

ISO/TC 204 more

Collaborative business relationship management systems — Requirements and framework

40.60 Close of voting

ISO/TC 286 more

Collaborative business relationship management systems — Guidelines on the implementation of ISO 44001

20.00 New project registered in TC/SC work programme

ISO/TC 286 more

Collaborative business relationship management system — Guidance on leadership for collaborative working

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 286 more