Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Systems and software engineering — Systems and software product Quality Requirements and Evaluation (SQuaRE) — Common Industry Format (CIF) for usability: Context of use description
40.20 DIS ballot initiated: 12 weeks
Systems and software engineering — Software product quality Requirements and Evaluation (SQuaRE) — Common Industry Format (CIF) for Usability: Design specification of user-system interaction and user interface
10.99 New project approved
Corrosion of metals and alloys — Guidelines for drawing regional corrosion map — Detailed measurements of corrosion and interpolation method
40.99 Full report circulated: DIS approved for registration as FDIS
Textiles - Circular economy for textile products — Part 1: Categorisation of and requirements on non-virgin input materials
00.00 Proposal for new project received
Textiles - Circular economy for textile products — Part 2: General principles and guidance
00.00 Proposal for new project received
Textiles - Circular economy for textile products — Part 3: Design for circularity
00.00 Proposal for new project received
Ships and marine technology — Mobile emergency unloading pump system — Technical requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Lignins — Determination of particle size distribution in kraft lignin, soda lignin and hydrolysis lignin
40.00 DIS registered
Liquid petroleum products — Determination of trace levels of Chlorine in petroleum products by X-ray Fluorescence Spectrometry
20.00 New project registered in TC/SC work programme
Ships and marine technology — Guidelines for the design and manufacture of energy saving devices installed in front of marine propellers
20.99 WD approved for registration as CD
Nonwovens — Test methods for filtration of particulate matter
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Space systems — Assessment of GNSS-based positioning system — Part 1: Definitions and system engineering procedures for the establishment and assessment of performances
40.20 DIS ballot initiated: 12 weeks
Assessment of GNSS-based positioning systems — Part 2: Part 2: Nominal accuracy performances during operations in typical environments
20.00 New project registered in TC/SC work programme
Health informatics --Categorial structure of representation of Tuina and other types of manual therapies
30.60 Close of voting/ comment period
Prefabricated building — Terminology and general principles
40.20 DIS ballot initiated: 12 weeks