Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Road vehicles — Logical interface between sensors and data fusion unit for automated driving functions — Part 2: Object level interfaces
60.00 Standard under publication
Road vehicles — Logical interface between sensors and data fusion unit for automated driving functions — Part 20: Supportive and sensor input interfaces
60.00 Standard under publication
Nanotechnologies — Particle size distribution for cellulose nanocrystals
10.99 New project approved
Oil and gas industries including lower carbon energy — Pipeline transportation systems — Procedures of stress detecting for pipeline in service
30.60 Close of voting/ comment period
Determination of the silanol group content on the surface of fumed silica — Part 2: Thermogravimetric analysis method
20.60 Close of comment period
Ships and marine technology — Test method for marine magnetic compass safe distance
00.00 Proposal for new project received
Soil quality — Determination of selected organotin compounds — Gas-chromatographic method
20.00 New project registered in TC/SC work programme
Sustainable mobility and transportation — Smart operation and maintenance — Part 1: Service role architecture
40.20 DIS ballot initiated: 12 weeks
Sustainable mobility and transportation — Smart operation and maintenance — Part 2: Principles and requirements based on management process
00.00 Proposal for new project received
Sustainable mobility and transportation — Smart operation and maintenance — Part 3: Evaluation and improvement based on maturity model
00.00 Proposal for new project received
Enterprise modelling and architecture — Constructs for Service Modelling
00.60 Close of review
Uncoupling membranes/matting for ceramic tile installation
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Numerical control systems for machine tools — Part 3: Safety guidelines for NC system
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Numerical control systems for machine tools — Part 4: Intelligent function requirements of NC system
00.00 Proposal for new project received
Natural gas — Format for data from gas chromatograph analysers for natural gas — XML file format
50.00 Final text received or FDIS registered for formal approval
Drilling and foundation machinery — Horizontal directional drilling (HDD) machines — Safety requirements and verification
40.99 Full report circulated: DIS approved for registration as FDIS
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received