Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Health informatics — Guidelines on data protection to facilitate trans-border flows of personal health data
20.00 New project registered in TC/SC work programme
Biotechnology — Biobanking — Requirements for human mesenchymal stromal cells derived from umbilical cord tissue
30.60 Close of voting/ comment period
Biotechnology — Metadata specifications for human mesenchymal stem cells
00.00 Proposal for new project received
Fireworks--Test methods for determination of specific chemical substances — Part 17: Determination of potassium chlorate by ion chromatography
00.60 Close of review
Fireworks--Test methods for determination of specific chemical substances — Part 18: Determination of sodium bicarbonate by potentiometric titration
00.60 Close of review
Fireworks--Test methods for determination of specific chemical substances — Part 19: Silver fulminate in snaps Flame atomic absorption spectrophotometry.
00.60 Close of review
Castors and wheels — Requirements for swivel castors for hospital beds.
40.00 DIS registered
Determination of the resistance to jet fires of passive fire protection materials — Part 2: Guidance on test method selection and implementation methods
40.60 Close of voting
Water quality — Radium 226 and Radium 228 — Test method using liquid scintillation counting
20.00 New project registered in TC/SC work programme
Industrial trucks — Verification of stability — Part 13: Rough-terrain trucks with mast
60.00 Standard under publication
Industrial trucks — Verification of stability — Part 21: Order-picking trucks with operator position elevating above 1 200 mm
40.60 Close of voting
Industrial trucks — Verification of stability — Part 23: Lorry-mounted trucks
30.99 CD approved for registration as DIS
Industrial trucks — Verification of stability — Part 4: Pallet-stacking trucks, double-stackers and order-picking trucks with operator position elevating up to and including 1 200 mm lift height
40.60 Close of voting
Industrial trucks — Verification of stability — Part 8: Additional stability test for trucks operating in the special condition of stacking with mast tilted forward and load elevated
60.00 Standard under publication
Microfluidic devices — Interoperability requirements for dimensions, connections and initial device classification
30.20 CD study/ballot initiated
Monitoring and dose assessment for occupational exposures to tritium
00.00 Proposal for new project received
Mining — Vocabulary — Part 11: Mobile machines
00.00 Proposal for new project received
Mining — Vocabulary — Part 5: Drilling and blasting
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks