Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Glass in building — Vacuum insulating glass — Part 1: Basic specification of products and evaluation methods for performance
40.20 DIS ballot initiated: 12 weeks
Meteorology — Weather radar — Part 1: System performance and operation
10.99 New project approved
Fibre-reinforced plastic composites — Determination of interlaminar strength and modulus by double beam shear test
30.60 Close of voting/ comment period
Plastics — Temperature modulated DSC — Part 4: Quasi isothermal measurement of specific heat capacity
20.00 New project registered in TC/SC work programme
Acoustics — Description, measurement and assessment of environmental noise — Part 1: Basic quantities and assessment procedures
00.00 Proposal for new project received
Acoustics — Description, measurement and assessment of environmental noise — Part 2: Determination of sound pressure levels
00.00 Proposal for new project received
Acoustics — Description, measurement and assessment of environmental noise — Part 2: Determination of sound pressure levels
00.00 Proposal for new project received
Space systems — Spacecraft and launch vehicle combined operation plan (COP) at launch site — General format
40.20 DIS ballot initiated: 12 weeks
Copper, lead and zinc sulfide concentrates — Determination of cadmium — Part 1: Flame atomic absorption spectrometric method
40.20 DIS ballot initiated: 12 weeks
Fusion technology — Experimental magnetic confinement fusion facilities — Supersonic molecular beam injection fuelling technique for fusion devices
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Sludge recovery, recycling, treatment and disposal — Thickening and dewatering
30.99 CD approved for registration as DIS
Guidelines for good practices in zeta-potential measurement
30.60 Close of voting/ comment period
Structural bolting coordination — Tasks and responsibilities
50.00 Final text received or FDIS registered for formal approval
Information technology — Service management — Part 18: Guidance on the use of experience management in a service management system
50.00 Final text received or FDIS registered for formal approval
Food loss and waste management system — Requirements for the prevention and minimization of food loss and waste across the food supply chain
50.00 Final text received or FDIS registered for formal approval
Quantification, measurement, monitoring and reporting methods for excess food and food loss and waste
20.00 New project registered in TC/SC work programme