DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 1: Minimum requirements prior and after weathering and climatic testing

40.99 Full report circulated: DIS approved for registration as FDIS

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 2: Determination and evaluation of resistance to rain erosion using rotating arm

30.60 Close of voting/ comment period

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 5: Measurement of transmittance properties of UV protective coatings

20.00 New project registered in TC/SC work programme

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 7: Determination and evaluation of resistance to hail

30.99 CD approved for registration as DIS

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 9: Determination and evaluation of ice adhesion using shear test.

30.99 CD approved for registration as DIS

ISO/TC 35/SC 9 more

Footwear sizing — In-shoe measurement — Part 2: Part 2: Technical Ball Girth and ball width

10.99 New project approved

ISO/TC 137 more

Refrigerated food lockers — Thermal and energy performance, ratings, environmental test conditions and associated testing methods

60.00 Standard under publication

ISO/TC 86/SC 7 more

Structures for mine shafts — Part 1: Vocabulary

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Structures for mine shafts — Part 2: Headframe structures

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Structures for mine shafts — Part 3: Sinking stages

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Structures for mine shafts — Part 4: Conveyances

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Structures for mine shafts — Part 5: Shaft system structures

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 82 more

Structures for mine shafts — Part 6: Design of shaft lining

20.60 Close of comment period

ISO/TC 82 more

Building construction machinery and equipment — Portable, hand-held, internal combustion engine-driven abrasive cutting machines — Part 2: Safety requirements for machines for abrasive chains

50.00 Final text received or FDIS registered for formal approval

ISO/TC 195 more

Quality management systems — Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety (ITNS)

30.60 Close of voting/ comment period

ISO/TC 85 more

Road vehicles — Environmental conditions and testing for electrical and electronic equipment for drive system of electric propulsion vehicles — Part 6: Traction battery packs and systems

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

ISO/TC 22/SC 32 more

Determination of rare earth impurity contents in individual rare earth metals and their oxides — Inductively coupled plasma mass spectrometry Part 1: Determination of rare earth impurity contents in individual La, Ce, Pr, Nd, Sm metals and their oxides

20.99 WD approved for registration as CD

ISO/TC 298 more

Intelligent transport systems — Data interfaces between centres for transport information and control systems — Platform-independent model specifications for data exchange protocols for transport information and control systems

10.99 New project approved

ISO/TC 204 more