Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 1: Minimum requirements prior and after weathering and climatic testing
40.99 Full report circulated: DIS approved for registration as FDIS
Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 2: Determination and evaluation of resistance to rain erosion using rotating arm
30.60 Close of voting/ comment period
Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 5: Measurement of transmittance properties of UV protective coatings
20.00 New project registered in TC/SC work programme
Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 7: Determination and evaluation of resistance to hail
30.99 CD approved for registration as DIS
Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 9: Determination and evaluation of ice adhesion using shear test.
30.99 CD approved for registration as DIS
Footwear sizing — In-shoe measurement — Part 2: Part 2: Technical Ball Girth and ball width
10.99 New project approved
Structures for mine shafts — Part 1: Vocabulary
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 2: Headframe structures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 3: Sinking stages
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 4: Conveyances
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 5: Shaft system structures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 6: Design of shaft lining
20.60 Close of comment period
Building construction machinery and equipment — Portable, hand-held, internal combustion engine-driven abrasive cutting machines — Part 2: Safety requirements for machines for abrasive chains
50.00 Final text received or FDIS registered for formal approval
Quality management systems — Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety (ITNS)
30.60 Close of voting/ comment period
Road vehicles — Environmental conditions and testing for electrical and electronic equipment for drive system of electric propulsion vehicles — Part 6: Traction battery packs and systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Determination of rare earth impurity contents in individual rare earth metals and their oxides — Inductively coupled plasma mass spectrometry Part 1: Determination of rare earth impurity contents in individual La, Ce, Pr, Nd, Sm metals and their oxides
20.99 WD approved for registration as CD
Intelligent transport systems — Data interfaces between centres for transport information and control systems — Platform-independent model specifications for data exchange protocols for transport information and control systems
10.99 New project approved