Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Transfusion and infusion sets and accessories — Infusate compatibility — Requirements and assessment methods
40.20 DIS ballot initiated: 12 weeks
Tourism and related services — Camping tourism — Requirements and recommendations for campsite facilities and services
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Tourism and related services — Restaurants – Guidelines for buffet design and services
40.60 Close of voting
Sustainable tourism — Good practices for implementing fundamental principles of sustainable tourism in tourism destinations
40.60 Close of voting
Guidelines for hybrid meeting service
40.99 Full report circulated: DIS approved for registration as FDIS
Plastics — Strain rate dependent tensile tests for thermoplastics at ambient temperature
40.93 Full report circulated: decision for new DIS ballot
Oil and gas industries including lower carbon energy — Drilling, production and injection equipment — Top drive systems
50.00 Final text received or FDIS registered for formal approval
Implants for surgery — Joint replacement implants — Methods for cleaning, wear measurements, and wear rate determination
30.00 Committee draft (CD) registered
Plastics — Water meter cabinet — Materials and design specifications
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastic scaffold planks — Performance and general design requirements
20.00 New project registered in TC/SC work programme
Document management — Electronic document file format for long-term preservation — Part 4: Use of ISO 32000-2 (PDF/A-4)
40.60 Close of voting
Microscopes — Designation of microscope objectives — Part 2: Chromatic correction
30.00 Committee draft (CD) registered
Rubber hoses and tubing for fuel circuits for internal combustion engines — Specification — Part 1: Diesel fuels
60.00 Standard under publication
Earth-moving machinery — Functional safety — Part 1: Methodology to determine safety-related parts of the control system and performance requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Earth-moving machinery — Functional safety — Part 2: Design and evaluation of hardware and architecture requirements for safety-related parts of the control system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks