Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Water quality — Polonium 210 — Test method using alpha spectrometry
20.20 Working draft (WD) study initiated
Water quality — Radon-222 — Part 2: Test method using gamma-ray spectrometry
40.60 Close of voting
Water quality — Radon-222 — Part 3: Test method using emanometry
40.60 Close of voting
Water quality — Uranium isotopes — Test method using alpha-spectrometry
00.00 Proposal for new project received
Water quality — Uranium — Test method using alpha liquid scintillation counting
50.00 Final text received or FDIS registered for formal approval
Martial arts — Wushu competition stick — Requirements and test methods
10.99 New project approved
Implants for surgery — Calcium phosphates — Part 3: Hydroxyapatite and beta-tricalcium phosphate bone substitutes
00.00 Proposal for new project received
Fibre reinforced polymer (FRP) reinforcement for concrete structures — Specifications for FRP bars and FRP grids
40.20 DIS ballot initiated: 12 weeks
Road vehicles — Reduction of misuse risk of child restraint systems — Part 1: Forms for field studies facilitating uniform collection of misuse data
20.00 New project registered in TC/SC work programme
Water-source heat pumps — Testing and rating for performance — Part 3: Testing and rating for performance
00.00 Proposal for new project received
Nanotechnologies — Determination of elemental impurities in samples of carbon nanotubes using inductively coupled plasma mass spectrometry
00.00 Proposal for new project received
Gear flank tolerance classification — Part 4: Definitions and allowable values of cylindrical worm gear tooth flank deviations
40.20 DIS ballot initiated: 12 weeks
Personal protective equipment — Footwear — Test method for slip resistance — Amendment 1
30.99 CD approved for registration as DIS
Small craft — Alternating and direct current installations of electrical systems — Part 1: Single-phase AC, Craft low voltage DC
40.20 DIS ballot initiated: 12 weeks
Small craft — Alternating and direct current installations of electrical systems — Part 2: Three-phase AC, Craft high voltage DC
20.60 Close of comment period