Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Paper and board — Testing of cores — Part 10: Determination of core axial crush
50.00 Final text received or FDIS registered for formal approval
Paper and board — Testing of cores — Part 9: Determination of flat crush resistance
20.00 New project registered in TC/SC work programme
ISO 11111-1 rev, Textile machinery — Safety requirements — — Part 1: Part 1: Common requirements
10.20 New project ballot initiated
ISO 11111-2 rev, Textile machinery — Safety requirements - — Part 2: Part 2: Spinning preparatory and spinning machines
10.20 New project ballot initiated
ISO 11111-3 rev, Textile machinery — Safety requirements — — Part 3: Part 3: Nonwoven machinery
10.20 New project ballot initiated
ISO 11111-4 rev, Textile machinery — Safety requirements - — Part 4: Part 4: Yarn processing, cordage and rope manufacturing machinery
10.20 New project ballot initiated
ISO 11111-5 rev, Textile machinery — Safety requirements - — Part 5: Part 5: Preparatory machinery to weaving and knitting
10.20 New project ballot initiated
ISO 11111-6 rev, Part 5: Preparatory machinery to weaving and knitting - — Part 6: Part 6: Fabric manufacturing machinery
10.20 New project ballot initiated
ISO 11111-7 rev, Textile machinery — Safety requirements - — Part 7: Part 7: Dyeing and finishing machinery
10.20 New project ballot initiated
Gas cylinders — Compatibility of cylinder and valve materials with gas contents — Part 1: Metallic materials
30.20 CD study/ballot initiated
Gas cylinders — Compatibility of cylinder and valve materials with gas contents — Part 2: Non-metallic materials
30.20 CD study/ballot initiated
Gas cylinders — Valve protection caps and guards — Design, construction and tests — Amendment 1
50.00 Final text received or FDIS registered for formal approval
Gas cylinders — Design, construction and testing of refillable composite gas cylinders and tubes — Part 2: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450 l with load-sharing metal liners
30.20 CD study/ballot initiated
Gas cylinders — Design, construction and testing of refillable composite gas cylinders and tubes — Part 3: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450 l with non-load-sharing metallic or non-metallic liners or without liners
30.20 CD study/ballot initiated
Preparation of steel substrates before application of paints and related products — Specifications for metallic blast-cleaning abrasives — Part 1: General introduction and classification
60.00 Standard under publication
Preparation of steel substrates before application of paints and related products — Specifications for non-metallic blast-cleaning abrasives — Part 9: Staurolite
30.00 Committee draft (CD) registered
Microbiology of the food chain, animal feed and water — Preparation, production, storage and performance testing of culture media and reagents
50.00 Final text received or FDIS registered for formal approval
Sterilization of health-care products — Ethylene oxide — Requirements for the development, validation and routine control of a sterilization process for medical devices
50.00 Final text received or FDIS registered for formal approval