Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
LPG equipment and accessories - Inspection and testing of LPG road tankers
40.60 Close of voting
Secure storage units - Requirements, classification and methods of test for resistance to burglary - Secure cabinets
40.60 Close of voting
Safety and control devices for burners and appliances burning gaseous or liquid fuels - Control functions in electronic systems - Methods for classification and assessment
40.60 Close of voting
Postal services - Quality of service - Measurement of the transit time of end-to-end services for bulk mail
40.60 Close of voting
Durability of wood and wood-based products - Determination of treatability of timber species to be impregnated with wood preservatives - Laboratory method
40.60 Close of voting
Installation and equipment for liquefied natural gas - Design and testing of marine transfer systems - Part 2: Design and testing of transfer hoses
40.60 Close of voting
Furniture - Domestic and kitchen storage units and kitchen-worktops - Safety requirements and test methods
40.60 Close of voting
Bitumen and bituminous binders - Determination of complex shear modulus and phase angle - Dynamic Shear Rheometer (DSR)
40.60 Close of voting
LPG equipment and accessories - Filling and discharge procedures for LPG rail tankers
40.60 Close of voting
Fixed firefighting systems - Water mist systems - Part 10: Test protocol for atrium protection with sidewall nozzles for open nozzle systems
40.60 Close of voting
Fixed firefighting systems - Water mist systems - Part 11: Test protocol for cable tunnels for open nozzle system
40.60 Close of voting
Fixed firefighting systems - Water mist systems - Part 14: Test protocol for combustion turbines in enclosures exceeding 260 m³ for open nozzle systems
40.60 Close of voting
Fixed firefighting systems - Water mist systems - Part 15: Test protocol for combustion turbines in enclosures not exceeding 260 m³ for open nozzle systems
40.60 Close of voting
Fixed firefighting systems - Water mist systems - Part 6: Test protocol for false floors and false ceilings for automatic nozzle systems
40.60 Close of voting
Fixed firefighting systems - Water mist systems - Part 7: Test protocol for commercial low hazard occupancies for automatic nozzle systems
40.60 Close of voting
Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing
40.60 Close of voting
Gas supply systems - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 2: Detailed functional requirements for commissioning, operation and maintenance
40.60 Close of voting
Railway applications - Technical documents - Part 3: Handling of modifications of technical documents
40.60 Close of voting