Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electronic displays for special applications - Part 2: Elevator and escalator
10.00 Proposal for new project registered
Electronic displays for special applications - Part 3: Gaming and e-sports
10.00 Proposal for new project registered
Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 1: Fuel cell power system
40.20 DIS ballot initiated: 12 weeks
Fluids for electrotechnical application - Specification of gases alternative to SF6 to be used in electrical power equipment
10.00 Proposal for new project registered
Thermal standardization on semiconductor packages - Part 3: Thermal circuit simulation models of discrete semiconductor packages for transient analysis
40.20 DIS ballot initiated: 12 weeks
Standard interface for connecting charging stations to local energy management systems - Part 1: General requirements, use cases and abstract messages
40.20 DIS ballot initiated: 12 weeks
Standard interface for connecting charging stations to local energy management systems - Part 2: Specific data model mapping
40.20 DIS ballot initiated: 12 weeks
Standard interface for connecting charging stations to local energy management systems - Part 3 Communication protocol and cybersecurity specific aspects
40.20 DIS ballot initiated: 12 weeks
Energy efficiency - Customer energy management systems - Part 1: General requirements and architecture
10.00 Proposal for new project registered
Generic RMS simulation models of inverter-based generators for power system dynamic analysis
10.00 Proposal for new project registered
Data container format for wearable sensor
10.00 Proposal for new project registered
System referencing conductor switching device
10.00 Proposal for new project registered
Low and ultra-low latency communication and control systems
10.00 Proposal for new project registered
Multimedia systems and equipment - Multimedia signal transmission - Dependable line code with error correction
40.20 DIS ballot initiated: 12 weeks
Pelton hydraulic turbines - Model acceptance tests
40.20 DIS ballot initiated: 12 weeks
User’s quality of experience on multimedia conferencing services - Part 2: Requirements
10.00 Proposal for new project registered
Common data concepts for smart manufacturing
10.00 Proposal for new project registered
Remote control and remote assistance system in home and local area
10.00 Proposal for new project registered