Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Touch and interactive displays - Part 42-10: Measurement methods of motion-tracking image-control response time for interactive projection display
10.00 Proposal for new project registered
Bi-directional grid-connected power converters - Part 1: General and safety requirements
40.20 DIS ballot initiated: 12 weeks
Utility-interconnected photovoltaic inverters - Test procedure for under voltage ride-through measurements
40.20 DIS ballot initiated: 12 weeks
Audio, video and information technology equipment - Routine electrical safety testing in production
10.00 Proposal for new project registered
Photovoltaic (PV) modules - Type approval, design and safety qualification - Retesting
40.20 DIS ballot initiated: 12 weeks
Corrigendum 1 - Photovoltaic (PV) modules - Type approval, design and safety qualification - Retesting
40.20 DIS ballot initiated: 12 weeks
Electric energy storage (EES) systems - Part 4-2: Guidance on environmental issues - Assessment of the environmental impact of battery failure in an electrochemical based storage system
10.00 Proposal for new project registered
Electrical energy storage (EES) systems - Part 4-3: Protection requirements of battery-based energy storage systems (BESS) according to environmental conditions
10.00 Proposal for new project registered
Electronic displays - Part 2-8: Measurements of optical characteristics - Reflective displays
10.00 Proposal for new project registered
Electronic displays - Part 3-6: Evaluation of optical performance - Spatial resolution
10.00 Proposal for new project registered
Particular requirements for source switching equipment (SSE)
10.00 Proposal for new project registered
Interoperability specifications and communication method for external power supplies used with computing and consumer electronics devices
10.00 Proposal for new project registered
Electrical interface specifications for self ballasted lamps and controlgear in phase-cut dimmed lighting systems
40.20 DIS ballot initiated: 12 weeks
Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 3: Electrical safety requirements
10.00 Proposal for new project registered
Intelligent device management - Part 1: Concepts and terminology
10.00 Proposal for new project registered
Information exchange for electric vehicle charging roaming service - Part 1: General
40.20 DIS ballot initiated: 12 weeks
Determination of inrush current characteristics of lighting products
10.00 Proposal for new project registered
Electrical household and similar cooling and freezing appliances - Food preservation
40.20 DIS ballot initiated: 12 weeks