DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Multimedia home network configuration - Basic reference model - Part 1: System model

10.00 Proposal for new project registered

DPS/KT 9 more

Plugs, socket-outlets and ship couplers for high-voltage shore connection (HVSC) systems - Part 1: General requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

Low-voltage switchgear and controlgear enclosed equipment - Part 1: Additional requirements for enclosed switch-disconnectors in accordance with IEC 60947-3 - Isolation of electrical equipment during repair and maintenance work in specific applications

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

3D displays - Part 62-12: Measurement methods for virtual-image type - Image quality

10.00 Proposal for new project registered

DPS/KT 9 more

Industrial networks - Coexistence of wireless systems - Part 2: Coexistence management

10.00 Proposal for new project registered

DPS/KT 9 more

Industrial networks - Coexistence of wireless systems - Part 4: Coexistence management with central coordination of wireless applications

10.00 Proposal for new project registered

DPS/KT 9 more

Video surveillance systems for use in security applications - Part 4: Application guidelines

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Universal serial bus interfaces for data and power - Part 1-2: Common components - USB Power Delivery specification

10.00 Proposal for new project registered

DPS/KT 9 more

Universal serial bus interfaces for data and power - Part 1-3: Common components - USB Type-C® cable and connector specification

10.00 Proposal for new project registered

DPS/KT 9 more

Paints and varnishes - Determination of resistance to humidity - Part 2: Condensation (in-cabinet exposure with heated water reservoir) (ISO 6270-2:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 298 more

Flexible displays - Part 6-41: Mechanical test methods - General introduction for rollable displays

10.00 Proposal for new project registered

DPS/KT 9 more

Systems interface between customer energy management system and the power management system - Part 2: Use cases

10.00 Proposal for new project registered

DPS/KT 9 more

Systems interface between customer energy management system and the power management system - Part 4: Demand Side Resource Interface

10.00 Proposal for new project registered

DPS/KT 9 more

Distributed energy resources connection with the grid - Part 102: CAES connection to the grid

10.00 Proposal for new project registered

DPS/KT 3 more

Measurement procedures for materials used in photovoltaic modules - Part 2: Polymeric materials - Frontsheets and backsheets

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 1: Crystalline silicon

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Lithium ion capacitors for use in electric and electronic equipment - Test methods for electrical characteristics

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Electric vehicle battery swap system - Part 1: General and guidance

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more