Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Railway applications - Electronic power converters for fixed installations - Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks
Display lighting unit - Part 1-6: Quantum dot films and quantum dot diffuser plates used in backlight unit
10.00 Proposal for new project registered
Overhead distribution cables of rated voltage U0/U(Um): 0,6/1 (1,2) kV
10.00 Proposal for new project registered
Multimedia home network configuration - Basic reference model - Part 1: System model
10.00 Proposal for new project registered
Plugs, socket-outlets and ship couplers for high-voltage shore connection (HVSC) systems - Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks
Low-voltage switchgear and controlgear enclosed equipment - Part 1: Additional requirements for enclosed switch-disconnectors in accordance with IEC 60947-3 - Isolation of electrical equipment during repair and maintenance work in specific applications
40.20 DIS ballot initiated: 12 weeks
3D displays - Part 62-12: Measurement methods for virtual-image type - Image quality
10.00 Proposal for new project registered
Industrial networks - Coexistence of wireless systems - Part 2: Coexistence management
10.00 Proposal for new project registered
Industrial networks - Coexistence of wireless systems - Part 4: Coexistence management with central coordination of wireless applications
10.00 Proposal for new project registered
Video surveillance systems for use in security applications - Part 4: Application guidelines
40.20 DIS ballot initiated: 12 weeks
Universal serial bus interfaces for data and power - Part 1-2: Common components - USB Power Delivery specification
10.00 Proposal for new project registered
Universal serial bus interfaces for data and power - Part 1-3: Common components - USB Type-C® cable and connector specification
10.00 Proposal for new project registered
Paints and varnishes - Determination of resistance to humidity - Part 2: Condensation (in-cabinet exposure with heated water reservoir) (ISO 6270-2:2025)
40.20 DIS ballot initiated: 12 weeks
Flexible displays - Part 6-41: Mechanical test methods - General introduction for rollable displays
10.00 Proposal for new project registered
Systems interface between customer energy management system and the power management system - Part 2: Use cases
10.00 Proposal for new project registered
Systems interface between customer energy management system and the power management system - Part 4: Demand Side Resource Interface
10.00 Proposal for new project registered
Distributed energy resources connection with the grid - Part 102: CAES connection to the grid
10.00 Proposal for new project registered
Measurement procedures for materials used in photovoltaic modules - Part 2: Polymeric materials - Frontsheets and backsheets
40.20 DIS ballot initiated: 12 weeks